I am ploughing a plot of land.It needs to be drained in a number of places.I am being told I should put the shores in before ploughing .I am unsure about this.I estimate that the shores will cost around €10 a meter when stone and contractor costs are taken into account .The shores planned are ones stoned to the surface with no drainage pipe.My issue is putting a shore in at this price and then pulling plough through part of it is a bit of a waste.My question is would it be possible to plough first and then put in your shores before harrowing between the shores