Arthur
Well-Known Member
Thats all I could visualise as I posted above but a lazer cut hedge from A -B would look stupid if the ground deviated by a metre over distance, you would have a hedge that was a metre higher where the ground was lower iykwim, basically it wouldnt be following the contours of the field.I was thinking that myself, but it was the only possible thing I could think of, unless they have a digger type system on board that’s guiding levels but it would be hard to see it working?